- Pilot thread is M8*1 for copper tube,Wire length: 9.84inch on pilot burner & 7.87in for spare wire,Terminal: Flat 4.8mm universal
- Inlet valve thread M10*1, outlet thread 7/16"-24 UNS, Pilot thread M8*1,Please refer to the example picture for the appropriate assembly and installation. Copper sealing rings need to be placed at both ends of the aluminum tube, and nuts and caps need to be used to fasten them to the valve and the pilot light respectively. If you are not sure, please consult customer service.
- Pilot thread is M8*1 for copper tube,Wire length: 9.84inch on pilot burner & 7.87in for spare wire,Terminal: Flat 4.8mm universal
- 2 pc 4mm Sealing rings,1 x 4mm aluminum tube 39.5 inches, 1 x internal thread M8*1 set of 4MM pipe, 1 x external thread M8*1 set of 4MM pipe Diameter of the aluminum tube is 0.16“(4mm),Valve Pilot Burner Tube Pipe Assembly,Gas Pilot Tubing
- Patio Heaters THP-ATM Anti Tilt Switch for Patio Heater,FD4 Dump Switch 250VAC 15A,125VAC 20A T125
- The entire kit is easy to replace and solves various problems at once.After the valve is installed as a whole, it is necessary to test whether each part is connected tightly.
- Special Reminder: When installing the aluminum tube to connect the valve and the constant open flame, first check whether the two ends of the aluminum tube are blocked. If you need to cut the aluminum tube, please use professional tube cutting equipment (do not use scissors and cutting machines). You can coil the overlong aluminum tube for storage. Be careful not to flatten the aluminum tube, and do not force it when bending it. Please assemble and install the valve kit according to the installation diagram shown on the web page.
- When connecting the aluminum pipe, the sealing rings in the kit must be used at both ends to avoid the risk of gas leakage.
Valve replacement as a whole set, complete with various accessories